Cracks, movement and monitoring
What does a subsidence survey cost?
£495 median of 7 providers' published prices for structural engineer report, £250 to £700, read 11 November 2026. Subsidence Survey Fee Index
Get quotes from local structural engineers
- We email you the questions a firm needs answered, straight away.
- You answer them by reply, or on this site.
- Months
- level monitoring normally runs across a full seasonal cycle, not days or weeks
our cost-driver table
- Insurer first
- subsidence investigation and any resulting works are usually handled as a buildings insurance claim
how the claim route works
- Lowest
- £250
- Median
- £495
- Highest
- £700
7 prices published for structural engineer report, read . Every price, with its source
Your situation, answered
-
How long does subsidence monitoring take?
It can take a year. The Financial Ombudsman says monitoring over 12 months is sometimes reasonable because it covers all the seasons, and lists crack monitoring with trial holes, borehole sampling and a CCTV drain survey as part of a thorough investigation.
Source: Financial Ombudsman Service, Subsidence and other types of ground movement, read 14 November 2026. More on this
-
Can a tree near my house cause subsidence?
Yes, on shrinkable clay. The Financial Ombudsman names nearby vegetation drawing water from the ground, particularly in long, hot summers, as a cause, and says an insurer will usually ask an arboriculturist which remedy fits. Cutting a tree back too hard can cause heave.
Source: Financial Ombudsman Service, Subsidence and other types of ground movement, read 14 November 2026
-
Do structural engineers publish their fees?
Few do. Of the 89 providers' pages we read in full on 11 November 2026, 10 publish a fee and 79 publish none.
Source: subsidencesurveycost.co.uk, Subsidence Survey Fee Index, read 11 November 2026. More on this
What drives the cost of a subsidence investigation
Most cracking is not subsidence. The usual first step, a structural engineer's visual inspection and written report, typically costs £300–£800 in 2026 by region, size and depth. Investigation, monitoring, drainage and root work cost extra. Insured? Tell your insurer first.
| Factor | Why it moves the price | What to ask for |
|---|---|---|
| Inspection and report versus full investigation | A visual inspection with a written opinion is a few hours of an engineer's time. A full investigation adds trial pits, soil sampling and lab work, each of which is a separate site visit and a separate specialist. | A fixed fee for the inspection and report, stated in writing, with the investigation stages priced as options rather than assumed. |
| Monitoring duration | Movement is diagnosed by watching it. Level or crack monitoring is normally read repeatedly across a full seasonal cycle, so the cost is the number of visits multiplied by the visit rate, plus the interpretation at the end. | How many readings, at what interval, over what total period, and whether the closing interpretation report is included in the quoted figure. |
| Drainage investigation (CCTV survey) | Leaking drains are one of the common causes of localised ground movement, so a CCTV drainage survey is often commissioned early. Cost follows the length of run surveyed, access, and whether jetting is needed first to see anything. | Whether jetting is included or extra, and whether you get the raw footage and a coded report, not just a verbal summary. |
| Vegetation and root identification | Where clay shrinkage is suspected, roots recovered from trial pits are identified to species by a laboratory so the responsible tree can be established. That is a lab fee plus an arboricultural opinion on top of the engineer's time. | Whether root identification and any arboricultural report are inside the quote or billed separately. |
| Whether the insurance claim route covers it | Subsidence investigation and any resulting works are normally dealt with as a buildings insurance claim, with the insurer appointing and paying for the investigation subject to the policy excess. Commissioning work privately before speaking to the insurer can mean paying for it yourself. | Your own policy schedule: what the subsidence excess is and what the insurer requires before work starts. Ask the engineer whether they routinely work on insurer-appointed claims. |
| Access, property size and construction | A large detached house, a listed or non-standard building, restricted side access, or movement affecting several elevations all add inspection time and often extra trial pits. | A site visit or photographs before the fee is fixed, so the quote reflects the actual building rather than an assumed semi. |
| Repair scheme design and supervision | If a repair scheme is needed, designing it, specifying it and supervising the contractor are professional fees in their own right, separate from the diagnostic work that came before. | A separate line for design and supervision, so you can see what is diagnosis and what is delivery. |
How these figures were put together
Subsidence work is not one purchase. It is a sequence, and each stage is quoted separately. This table sets out the factors that decide what you pay, why each one moves the price, and the question to put to the engineer before you accept a fee.
Compiled from the standard sequence of a UK domestic subsidence investigation: initial structural inspection, a monitoring period, then targeted investigation of drainage and vegetation before any repair scheme is designed. It is a cost-driver table rather than a price list, because the only stage with a reliably typical market price is the initial inspection and report; everything after it is scoped to the individual building. The one figure quoted on this site, £300–£800 for a domestic structural engineer's visual inspection and written report, is a typical 2026 quote range that varies by region, property size and report depth, not a fixed price. Get quotes for your own property through the form above.
What happens next
First
Tell us what you are seeing, the property type and how long it has been going on. Two minutes, no account.
Next
We pass your details to structural engineers covering your postcode, and to no one else.
Then
They contact you directly with their fee for the work your property actually needs.
Subsidence Survey Cost is a free introduction service; we pass your details to relevant local structural engineers who quote you directly. We may receive a fee from providers; you pay nothing and are under no obligation. We are not engineers, surveyors or insurance intermediaries, we are not affiliated with any body named on this site, and nothing here is structural, legal or insurance advice. The one price range quoted here is a typical 2026 quote range that varies by region, property size and report depth, not a fixed price.
Read further
- Questions answered (9)
- Structural engineer report cost: the subsidence survey fee in the UK
- Subsidence crack or just cracking? How the difference is established
- Subsidence investigations and analysis: the sequence and its cost
- Subsidence risk postcode checker: what a postcode can tell you
- Subsidence cost: what it costs to repair subsidence in the UK
Sources
This site's own datasets, every figure quoted from its source and dated:
- The Subsidence Insurance Terms carries 3 published figures read from 3 sources' own pages, from 1,000 to 1,000 GBP, read 12 September 2026.
- The Subsidence Professional Registers carries 3 published figures read from 1 source's own page, from 48,318 to 48,550 members, read 11 November 2026.
- The median published figure in the Subsidence Risk and Claims is 65 percent across 3 figures from 2 sources' own pages (range 48 to 108.50 percent), read 11 November 2026.
- For structural engineer report, the median published figure in the Subsidence Survey Fee Index is 495 GBP across 7 figures from the sources' own pages (range 250 to 700 GBP), read 11 November 2026.